Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3462

Re: ABOUT AVAILABLE CHECK

$
0
0

Hi,

 

check below mentioned way

 

what is the item category in Both OR & CS sales document is it same or different?

if its different are you using the same material in both the documents?

check what is the MRP type assigned in the material master which you are using in CS document

is there any requirement type identified in Procurement tab for CS and OR documents ?

 

now check the Requirement class for the combination of Item category + MRP type in "OVZI"

also check what is the requirement class assigned for the above requirement type in "OVZH"

now check in the above requirement class whether availability check option selected or not in "OVZG"

 

Thanks,

Krishna.


Viewing all articles
Browse latest Browse all 3462

Trending Articles